EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
-
Wing tips and flaps
-
Hardware
-
Hardware
-
Wing Mounting
-
Prep
-
Wing Root Fairing
-
Strut fairings
-
Strut fairings
-
Wingtips
-
Wingtips
-
Wingtips
-
Wingtips
-
AD-142 Fuel Tank...
-
Left Wingtip
-
Wing Removal
-
Mounting wings
-
Wing Attach
-
Left Wing Tip
-
Wing Struts
-
Wing Struts
-
Wing Struts
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Right wing build up
-
Right Wing Build-Up...
-
Right Wing Build-Up...
-
Right wing build up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing buildup
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Spars
-
Spars
-
Wing Build-Up
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Aug 12, 2021
Left Wing Build-Up
- (2.2 hours)
Category: Wings
Pre-assembled fuel tank fittings for both fuel tanks. Made drill guide for filler cap hole drilling.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.